CONSTRUCTION%20WORKER_edited.jpg
_M__0161_edited_edited_edited.jpg

ABOUT US

Tarpave is a road surfacing company based in Bathgate West Lothian, we carry out numerous commercial and private projects throughout Scotland. however, our client base is generated mostly from the commercial sector. Health and safety are important to us and take precedence first and foremost. As a SEPA registered company, we like to keep a clean and pollution-free working environment. All our operatives are CSCS registered, and hold industry-standard NRSWA - CPCS, and NPORS cards. We pride ourselves on professionalism and efficiency, this is our key to success.

QUALITY AND EXCELLENCE ARE NOT SOMETHING THAT IS ACHIEVED OVERNIGHT. 

Road Constuction

TAR - PAVE LIMITED.

ARE A ROAD SURFACING COMPANY CARRYING 
OUT A VARIETY OF PROJECTS FOR CLIENTS THROUGHOUT SCOTLAND COVERING THE
COMMERCIAL AND PRIVATE SECTOR'S

WHAT WE DO.

PHASE 1 PREPERATION: 

This car park at Tesco was prepped by removing the existing tar surface from the car park, using a road Planing machine. The surrounding area was then brushed off with the use of a road sweeper. The car park was then sprayed with a bituminous adhesive emulsion, to bond the newly laid base coat to the existing surface.

Photo 08-05-2018, 08 18 42.png
Reinstating.png

BREAKING OUT PARKING BAYS.

PHASE 2 PREPERATION

Using breaker to loosen off old and degraded asphalt, digging out and around curbed areas, and manhole covers. These are the areas that can't be accessed with a road planer. 

ROLLING AND SEALING ALL ASPHALT JOINTS

  PHASE 3 SURFACING:

 

Asphalt has been machine laid

with a 20mm precoated chip added. At this point, We are in the final stages of completion. All parking bays have been surfaced, as well as painted and sealed. All other areas are being rolled and compacted at this stage.

Photo%2006-03-2018%2C%2015%2042%2047_edi
Photo%2006-03-2018%2C%2015%2021%2022_edi

ASPHALT SURFACE ROLLED AND SEALED

PHASE 4 SURFACING COMPLETED

All surfacing to the car park and the surrounding area has been completed.

All joints sealed with hot bitumen. Asphalt is being back rolled at this point, to smoothen out the surface.

PRIVATE PROJECT

This private road was machine laid and completed in three stages.

 

Stage 1: Hardcore

 Stage 2: Base Coat Stage 3: Asphalt

 

All three stages of this road were rolled and compacted.

roller pic.png
_M__0169_edited.jpg

FACTORY

Machine Laid Surface 

This factory car park was machine laid, All forecourt areas and bays were marked and sealed with thermoplastic coated paint.

 

imageedit_2_4603847287-removebg-preview.
We're ready to talk about your project.

SOME OF OUR CLIENT LIST

Company references can be acquired if necessary by telephone or email

istockphoto-1059723194-612x612_edited.jpg.jpeg

Need any help ?

DISCUSS YOUR PROJECT WITH US TODAY